C&I Solar Installations
Techsico Solar empowers businesses across Oklahoma with cutting-edge commercial solar solutions. Our expert team designs and installs custom solar systems that maximize energy efficiency and reduce operational costs. We guide you through every step of the process, from initial consultation to seamless installation and ongoing support. With our innovative approach and deep industry knowledge, we deliver tailored renewable energy solutions that meet your unique business needs.
Trust Techsico Solar to help your company harness the power of the sun, reduce your carbon footprint, and achieve long-term energy independence.
At Techsico Solar our culture comes to life through three core values:
- We deliver data-driven precision for optimal solar solutions
- We uphold unwavering transparency in all our interactions
- We prioritize affordability without compromising quality
What is the expected return on investment (ROI) and payback period?
The average payback period for commercial solar installations in 2024 typically ranges from 6 to 10 years. However, this can vary significantly based on factors such as location, costs, and available incentives. In regions with high electricity rates, businesses might see a payback period as short as 3 to 5 years, while areas with lower electricity costs may experience longer payback periods of up to 10-12 years
What is the system size and estimated energy production?
Commercial solar panels typically produce between 250 watts and 600 watts per panel, depending on their size and efficiency. A typical 50 kW commercial solar system (125 panels of 400W each) can produce 6,000 kWh to 9,000 kWh per month. The exact energy production depends on factors such as panel efficiency, sunlight exposure, and geographic location.
What incentives and financing options are available?
Several Options!
Cash purchase: Offers the fastest turnaround and all financial benefits.
Solar loans: Allow businesses to borrow money for installation and make monthly payments.
Power Purchase Agreements (PPAs): A third party owns the system, and the business pays for the electricity generated.
Solar leases: Businesses pay a monthly fee to use the panels and the electricity they generate.
Property Assessed Clean Energy (PACE): Enables 100% financing with long-term fixed interest rates.
What is the installation timeline and process?
The entire process of installing commercial solar panels typically takes four to six months.This timeline includes:
Pre-Analysis - Energy Aduit - 1 Week
System design and permitting: Up to 8 weeks.
Installation: 1 to 2 weeks (actual installation), but scheduling may take 6 to 8 weeks.
Inspection, interconnection, and system testing: 1 to 2 months.
System activation: 1 to 3 weeks